1. A method of managing program code in a semiconductor device comprising a first non-volatile memory and a second non-volatile memory separate from the first non-volatile memory device, the method comprising:
writing the program code to the first non-volatile memory before a solder reflow process is performed to connect the semiconductor device to a substrate;
copying the program code from the first non-volatile memory to a second non-volatile memory after the solder reflow process is performed;
operating a central processing unit (CPU) to store the program code in a shared memory bank of a multi-port memory device; and
operating a processor to copy the program code from the shared memory bank to a second memory bank of the multi-port memory device, and then to write the program code from the shared memory bank to the first non-volatile memory, which is different from the multi-port memory device.
2. The method of claim 1, wherein the second non-volatile memory is a phase-change memory.
3. The method of claim 1, further comprising deleting the program code from the first non-volatile memory after completely copying the program code to the second non-volatile memory.
4. A semiconductor device comprising:
a first non-volatile memory configured to store program code;
a processor configured to copy the program code from the first non-volatile memory to a second non-volatile memory separate from the first non-volatile memory after a solder reflow process is performed to connect the semiconductor device to a substrate; and
a multiport memory device comprising a shared bank memory accessed by a central processing unit (CPU) or the processor according to an access authority, wherein the CPU outputs the program code and controls writing of the program code to the shared bank memory and the processor controls writing of the program code from the shared bank memory to the first non-volatile memory, which is different from the multi-port memory device.
5. The semiconductor device of claim 4, wherein the processor is configured to copy the program code from the first non-volatile memory to the second non-volatile memory after the processor is completely booted.
6. The semiconductor device of claim 4, wherein the processor is configured to delete the program code from the first non-volatile memory after the program code is completely copied to the second non-volatile memory.
7. The semiconductor device of claim 4, wherein the second non-volatile memory is a phase-change memory.
8. The semiconductor device of claim 4, wherein the semiconductor device is a multi-chip package (MCP) semiconductor device.
9. The semiconductor device of claim 4, wherein the solder reflow process comprises infrared (IR) reflow.
10. A semiconductor system comprising:
a semiconductor device; and
a central processing unit (CPU) configured to control operation of the semiconductor device,
wherein the semiconductor device comprises:
a first non-volatile memory configured to store a program code; and
a processor configured to copy the program code from the first non-volatile memory to a second non-volatile memory separate from the first non-volatile memory after a solder reflow process is performed to connect the semiconductor memory device to a substrate;
wherein the semiconductor device further comprises:
a first memory bank configured to be accessed by the CPU;
a second memory bank configured to be accessed by the processor; and
a shared memory bank different from the first non-volatile memory and configured to be accessed by the CPU or the processor according to an access authority,
wherein the program code is input to the semiconductor device and written to the shared memory bank, and processor controls writing of the program code from the shared memory bank to the first non-volatile memory.
11. The semiconductor system of claim 10, wherein the second non-volatile memory is a phase-change memory.
12. The semiconductor system of claim 10, wherein the semiconductor device is a multi-chip package (MCP) semiconductor device.
13. The semiconductor system of claim 10, wherein the solder reflow process is infrared (IR) reflow.
14. The semiconductor system of claim 10, wherein the processor deletes the program code from the first non-volatile memory after the program code is completely copied to the second non-volatile memory.
15. The semiconductor system of claim 10, wherein the semiconductor system is one of a mobile telephone, a smart phone, a personal digital assistant (PDA), a portable multimedia player (PMP), and an information technology (IT) device.
16. The semiconductor system of claim 10, wherein the semiconductor system is a digital camera.
17. The semiconductor system of claim 10, wherein the semiconductor system is a memory card.
The claims below are in addition to those above.
All refrences to claim(s) which appear below refer to the numbering after this setence.
1. A method for automatically determining indirect and direct monetary damages resulting from a failure of technical components in objects integrated in a production cycle, the method comprising the steps of:
a) identifying the technical components affected by the failure,
b) determining the number of clients andor users depending on each of the affected technical components,
c) determining a time when each of the affected technical components will become available again, and
d) determining the extent of the indirect and direct monetary damages based on the results from steps a) through c)
wherein the indirect monetary damages includes at least one of: (i) new clients that cannot be activated as a result of the failure; (ii) dissatisfied existing clients canceling their contracts or failing to extend their contracts; (iii) additional costs associated with inquiries associated with the failure; and (iv) costs associated with signing up new clients.
2. The method according to claim 1, wherein the determining step d) comprises determining the extent of indirect and direct monetary damages for a selected particular phase of the production cycle.
3. The method according to claim 1, wherein the interdependencies of the affected technical components are measured and evaluated based on parameters and values residing in databases.
4. The method according to claim 1, wherein the step a) of identifying the technical components affected by the failure comprises the steps of selecting by the user a defined object, an object database is automatically queried based on the selected object for determining the affected technical components of the object.
5. The method according to claim 4, wherein the step b) of determining the number of clients andor users depending on each of the affected technical components comprises querying a client database for determining the currently administered clients andor users, a respective number of administered clients andor users for each component is determined based on the affected technical components.
6. The method according to claim 5, wherein the number of the affected clients andor users is associated with information regarding type and number of the technical components.
7. The method according to claim 6, wherein an order in which the failed components become available again is defined by a chronology of an existing emergencystartup measure, wherein investments, costs and operating modes of the respective emergency measure and startup measure are maintained in an emergency database.
8. The method according to claim 7, wherein the number of affected clients and duration of impairment is computed from the number of clients administered in the components and the chronology of the emergency and startup measures.
9. The method according to claim 8, wherein the direct damage to each individual component resulting from the failure of components is available in a database.
10. The method according to claim 9, wherein the indirect damage resulting from the failure of components is available in a database.
11. The method according to claim 10, wherein the extent of the monetary damage for a total failure of all components in an object is computed from the queries based on the determined number of the affected clients andor users and the parameters and values for the extent of the indirectdirect damage.
12. The method according to claim 11, wherein new installations of components andor movement of components among roomsbuildings are automatically simulated, and wherein the simulations are used to compute a maximum extent of the expected damage and the resulting number of affected clients.
13. The method according to claim 12, wherein when the extent of the damage exceeds a predefined maximum, those components are identified which can be moved to other technical roomsbuildings so as to stay below the defined maximum extent of the expected damage.
14. The method according to claim 13, wherein a room or rooms, or a building or buildings are suggested where the selected component to be moved can be installed.
15. Method for automatically determining indirect and direct monetary damages resulting from a failure of technical components in objects integrated in a production cycle, with a data input and processing device for carrying out the method, wherein interdependencies of the affected components are automatically measured and evaluated based on parameters and values residing in databases, comprising the steps:
a) identifying the technical components affected by the failure by querying an object database,
b) determining the number of clients andor users depending on each affected component by querying a client database,
c) determining a time when each of the affected technical components will become available again by querying an emergency database,
d) determining the extent of the indirect and direct monetary damages based on the results from steps a) through c),
wherein new installations of components andor movement of components to other technical roomsbuildings are automatically simulated, and wherein this data is used to compute a maximum extent of expected damage and resulting number of affected clients,
and wherein the indirect monetary damages includes at least one of: (i) new clients that cannot be activated as a result of the failure; (ii) dissatisfied existing clients canceling their contracts or failing to extend their contracts; (iii) additional costs associated with inquiries associated with the failure; and (iv) costs associated with signing up new clients.