1461095636-3761f032-f360-4a68-8828-ada415d7a0ee

1. A thin-film transistor (TFT), comprising:
a substrate;
a first poly-silicon mesa formed on said substrate;
an insulating layer formed on said substrate and covering said first poly-silicon mesa;
a gate metal layer formed on said insulating layer;
a color-filtering dielectric layer formed on said insulating layer and covering said gate metal layer, said dielectric layer being provided with a plurality of contact holes penetrating through said dielectric layer and said insulating layer; and
a conductive layer formed on said dielectric layer and coupled to said first poly-silicon mesa through said contact holes.
2. The thin-film transistor as recited in claim 1, wherein said first poly-silicon mesa is p-type.
3. The thin-film transistor as recited in claim 2, further comprising an n-type second poly-silicon mesa formed on said substrate and covered by said insulating layer, wherein said conductive layer is coupled to said second poly-silicon mesa through said contact holes.
4. The thin-film transistor as recited in claim 1, wherein said first poly-silicon mesa is n-type.
5. The thin-film transistor as recited in claim 1, wherein said substrate is transparent.
6. The thin-film transistor as recited in claim 1, wherein said substrate is made of one material selected from a group comprising glass, plastic, quartz, silicon and stainless steel.
7. The thin-film transistor as recited in claim 1, wherein said conductive layer is made of metal.
8. A method for manufacturing a thin-film transistor (TFT), said method comprising steps of:
providing a substrate;
forming a first poly-silicon mesa and a second poly-silicon mesa on said substrate;
doping said first poly-silicon mesa with an n-type dopant using ion implantation;
forming an insulating layer on said substrate, said insulating layer covering said first poly-silicon mesa and said second poly-silicon mesa;
forming a gate metal layer on said insulating layer corresponding to said first poly-silicon mesa and said second poly-silicon mesa;
doping said first poly-silicon mesa with an n-type dopant using ion implantation;
doping said second poly-silicon mesa with a p-type dopant using ion implantation;
forming a dielectric layer capable of color filtering on said insulating layer, said dielectric layer covering said gate metal layer;
forming a plurality of contact holes in said dielectric layer, said plurality of contact holes penetrating said dielectric layer and said insulating layer so as to contact said first poly-silicon mesa and said second poly-silicon mesa;
forming a conductive layer on said dielectric layer; and
etching said conductive layer.
9. The method as recited in claim 8, wherein said substrate is transparent.
10. The method as recited in claim 8, wherein said substrate is made of one material selected from a group comprising glass, plastic, quartz, silicon and stainless steel.
11. The method as recited in claim 8, wherein said conductive layer is made of metal.
12. A method for manufacturing a thin-film transistor (TFT), said method comprising:
providing a substrate;
forming a poly-silicon mesa on said substrate;
forming an insulating layer on said substrate, said insulating layer covering said poly-silicon mesa;
forming a gate metal layer on said insulating layer corresponding to said poly-silicon mesa;
doping said poly-silicon mesa with an p-type dopant using ion implantation;
forming a dielectric layer capable of color filtering on said insulating layer, said dielectric layer covering said gate metal layer;
forming a plurality of contact holes in said dielectric layer, said plurality of contact holes penetrating said dielectric layer and said insulating layer so as to contact said poly-silicon mesa;
forming a conductive layer on said dielectric layer; and
etching said conductive layer.
13. The method as recited in claim 12, wherein said substrate is transparent.
14. The method as recited in claim 12, wherein said substrate is made of one material selected from a group comprising glass, plastic, quartz, silicon and stainless steel.
15. The method as recited in claim 12, wherein said conductive layer is made of metal.

The claims below are in addition to those above.
All refrences to claim(s) which appear below refer to the numbering after this setence.

1- Fork for effecting translational movement of a sliding sleeve in a gearbox, comprising at least one insert, overmoulded in a body made of a thermoplastic resin, the at least one insert having a modulus of elasticity at least twice as high as a modulus of elasticity of the thermoplastic resin and shaped to form an arc-of-a-circle profile substantially matching the cross section delimited by prongs of the fork the resin being charged with glass fibres.
2- Fork according to claim 1, wherein the profile comprises a flat bar.
3- Fork according to claim 1, wherein the at least one insert comprises a ring for housing the drive shaft inserted, after overmoulding the body, into an orifice communicating with a through-hole to engage a means of locking the shaft in a translational and rotational manner.
4- Fork according to claim 3, wherein the locking means comprises a pin.

1461095626-5186a387-6000-4a41-8a0d-465d878d37b5

1. A method for drilling a borehole, comprising:
initiating a drilling phase;
monitoring a drill parameter during the drilling phase;
determining whether the monitored drill parameter is within a predetermined specification for the monitored drill parameter;
choosing a drilling phase defect mitigation routine based on the monitored drill parameter when the monitored drill parameter is outside the predetermined specification;
implementing the drilling phase defect mitigation routine; and
resuming the drilling phase.
2. The method of claim 1, wherein monitoring a drill parameter comprises monitoring one or more drill parameters selected from the group consisting of air pressure, drill rotational speed, drill torque, drill depth, and number of drill retractions.
3. The method of claim 2, wherein choosing a drilling phase defect mitigation routine further comprises choosing one or more drilling phase defect mitigation routines selected from the group consisting of air pressure protection, rotary stall protection, end-of-hole spin-out, and end-of-hole water control.
4. The method of claim 3, further comprising choosing said air pressure protection routine when said monitored air pressure is outside a predetermined specification for air pressure.
5. The method of claim 4, wherein said air pressure protection routine comprises:
retracting a drill bit;
applying air pressure to the drill bit;
monitoring the air pressure;
resuming the drilling phase when the monitored air pressure is within the predetermined specification; and
activating a drill water injection system to unclog the drill bit when the monitored air pressure is outside the predetermined specification.
6. The method of claim 3, further comprising choosing said rotary stall protection routine when one or both of said monitored drill rotational speed is outside a predetermined specification for rotational speed and said drill torque is outside a predetermined specification for drill torque.
7. The method of claim 6, wherein said rotary stall protection routine comprises:
retracting a drill bit;
rotating the drill bit; and
resuming the drilling phase with one or both of a reduced down-force and an increased rotational drill bit speed.
8. The method of claim 3, further comprising choosing said end-of-hole spin-out routine when said monitored drill depth meets a predetermined specification for drill depth.
9. The method of claim 8, wherein said end-of-hole spin-out routine comprises:
retracting a drill bit to a position above a bottom of the borehole;
rotating the drill bit for a spin-out period if the drill bit was retracted two or fewer times during the drilling phase;
rotating the drill bit for a product of the spin-out period and the number of drill retractions if the drill bit was retracted 3 or more times during the drilling phase; and
retracting the drill bit from the borehole.
10. The method of claim 3, further comprising choosing said end-of-hole water control routine when said monitored drill depth meets a predetermined specification for drill depth.
11. The method of claim 10, wherein said end-of-hole water control routine comprises deactivating a water injection system when a drill bit is within a predetermined distance from a bottom of the borehole.
12. The method of claim 1, further comprising performing a collaring routine after said initiating a drilling phase.
13. The method of claim 12, wherein performing a collaring routine further comprises:
performing a first phase collaring operation from a surface start until one or both of a penetration rate drops below a predetermined penetration rate and a drill bit reaches a maximum collaring depth; and
performing a second phase collaring operation after the penetration rate drops below the predetermined penetration rate.
14. The method of claim 13, wherein performing a second phase collaring operation comprises retracting the drill bit from the borehole.
15. The method of claim 14, further comprising re-lowering the drill bit to the bottom of the borehole at reduced hoist and drill rotation speeds.
16. The method of claim 15, further comprising confirming that competent ground is present at the bottom of the borehole.
17. The method of claim 1, further comprising:
initiating a retraction phase;
monitoring at least one drill parameter during the retraction phase;
determining whether the monitored drill parameter is within a predetermined specification for the monitored drill parameter;
choosing a retraction phase defect mitigation routine based on the monitored drill parameter when the monitored drill parameter outside the predetermined specification; and
implementing the retraction phase defect mitigation routine.
18. The method of claim 17, wherein monitoring a drill parameter comprises monitoring one or more drill parameters selected from the group consisting of drill rotational speed, drill torque, hoist speed, and number of drill retractions.
19. The method of claim 18, wherein choosing a retraction phase defect mitigation routine further comprises choosing one or more retraction phase defect mitigation routines selected from the group consisting of drill bit hang-up protection, torque monitoring, and hole clean-out.
20. The method of claim 19, further comprising choosing said drill bit hang-up protection routine when one or both of said monitored drill rotational speed is outside a predetermined specification for drill rotational speed and said monitored hoist speed is outside a predetermined specification for hoist speed.
21. The method of claim 20, wherein said drill bit hang-up protection routine comprises:
increasing the rotational speed of a drill bit;
lowering the drill bit;
determining whether the drill bit is freed; and
raising the drill bit at a reduced hoist speed.
22. The method of claim 21, further comprising:
alternately applying to the drill bit a down hoist force and an up hoist force; and
activating a water injection system if the drill bit is not freed after said alternately applying down and up hoist forces.
23. The method of claim 20, further comprising choosing said torque monitoring routine when said monitored drill torque is outside a predetermined specification for drill torque.
24. The method of claim 23, wherein said torque monitoring routine comprises:
performing said hole clean-out routine;
retracting a drill bit from the borehole;
resuming the drilling phase; and
performing an end-of-hole spin-out routine.
25. The method of claim 19, further comprising choosing said hole clean-out routine when one or more of said monitored drill retractions is outside a predetermined specification for drill retractions, said monitored hoist speed is outside a predetermined specification for hoist speed, and said monitored drill torque is outside a predetermined specification for drill torque.
26. The method of claim 25, wherein said hole clean-out routine comprises:
lowering a drill bit to a position above a bottom of the borehole;
rotating the drill bit for a spin-out period if the drill bit was retracted two or fewer times during the drilling phase;
rotating the drill bit for a product of the spin-out period and the number of drill retractions if the drill bit was retracted at least 3 times during the drilling phase; and
retracting the drill bit from the borehole.
27. A system for drilling a borehole, comprising:
a drill rig comprising a drill, an air injection system, and a water injection system;
a control system operatively associated with said drill rig, said control system receiving information from said drill rig relating to at least one drill parameter, controlling said drill rig, storing program steps for program control, and processing data;
said control system processing information relating to the drill parameter, determining whether the drill parameter is within a predetermined specification for the monitored drill parameter, choosing a hole defect mitigation routine based on the monitored drill parameter when the monitored drill parameter is outside the predetermined specification, said control system controlling said drill rig to implement the chosen hole defect mitigation routine.
28. The system of claim 27, wherein said hole defect mitigation routine comprises at least one drilling phase defect mitigation routine and at least one retraction phase defect mitigation routine.
29. The system of claim 28, wherein said drilling phase defect mitigation routine comprises one or more selected from the group consisting of air pressure protection, rotary stall protection, end-of-hole spin-out, and end-of-hole water control.
30. The system of claim 29, wherein said control system monitors one or more drill parameters selected from the group consisting of air pressure, drill rotational speed, drill torque, drill depth, and number of drill retractions.
31. The system of claim 30, wherein said control system implements said air pressure protection routine when said monitored air pressure is outside a predetermined specification for air pressure.
32. The system of claim 30, wherein said control system implements said rotary stall protection routine when one or both of said monitored drill rotational speed is outside a predetermined specification for rotational speed and said drill torque is outside a predetermined specification for drill torque.
33. The system of claim 30, wherein said control system implements said end-of-hole spin-out routine when said monitored number of drill retractions during the drilling phase is outside a predetermined specification for number of drill retractions.
34. The system of claim 30, wherein said control system implements said end-of-hole water control routine when said monitored drill depth exceeds a predetermined specification for drill depth.
35. The system of claim 30, wherein said retraction phase defect mitigation routine comprises one or more selected from the group consisting of drill bit hang-up protection, torque monitoring, and hole clean-out.
36. The system of claim 35 wherein said control system monitors one or more drill parameters selected from the group consisting of drill rotational speed, drill torque, hoist speed, and number of drill retractions.
37. The system of claim 36, wherein said control system implements said drill bit hang-up protection routine when one or both of said monitored drill rotational speed is outside a predetermined specification for drill rotational speed and said monitored hoist speed is outside a predetermined specification for hoist speed.
38. The system of claim 36, wherein said control system implements said torque monitoring routine when said monitored drill torque is outside a predetermined specification for drill torque.
39. The system of claim 36, wherein said control system implements said hole clean-out routine when one or more of said monitored drill retractions is outside a predetermined specification for drill retractions, said monitored hoist speed is outside a predetermined specification for hoist speed, and said monitored drill torque is outside a predetermined specification for drill torque.
40. A method for drilling a borehole, comprising:
monitoring a drill parameter;
using the monitored drill parameter to draw a conclusion about a borehole characteristic;
choosing a defect mitigation routine based on the borehole characteristic; and
implementing the defect mitigation routine.
41. The method of claim 40, wherein monitoring a drill parameter is conducted during a drilling phase.
42. The method of claim 41, wherein monitoring a drill parameter comprises monitoring one or more drill parameters selected from the group consisting of air pressure, drill rotational speed, drill torque, drill depth, and number of drill retractions.
43. The method of claim 42, wherein choosing a defect mitigation routine further comprises choosing one or more defect mitigation routines selected from the group consisting of air pressure protection, rotary stall protection, end-of-hole spin-out, and end-of-hole water control.
44. The method of claim 40, wherein monitoring a drill parameter is conducted during a retraction phase.
45. The method of claim 44, wherein monitoring a drill parameter comprises monitoring one or more drill parameters selected from the group consisting of drill rotational speed, drill torque, hoist speed, and number of drill retractions.
46. The method of claim 45, wherein choosing a defect mitigation routine further comprises choosing one or more retraction phase defect mitigation routines selected from the group consisting of drill bit hang-up protection, torque monitoring, and hole clean-out.
47. The method of claim 1, further comprising choosing an end-of-hole measurement routine when said monitored drill depth meets a predetermined borehole depth.
48. The method of claim 47, wherein said end-of-hole measurement routine comprises:
partially retracting a drill string from the borehole;
re-lowering the drill string in the borehole;
monitoring a drill parameter during said re-lowering;
comparing the monitored drill parameter with a corresponding set point; and
determining an \u201con ground position\u201d when the drilling parameter falls outside the corresponding set point.
49. The method of claim 48, wherein said determining comprises determining an \u201con ground position\u201d when the drilling parameter falls outside the corresponding set point for a predetermined period of time.
50. The method of claim 48, wherein monitoring a drill parameter during said re-lowering comprises monitoring one or more drill parameters selected from the group consisting of drill hoist speed, pull-down force, and drill torque.
51. The method of claim 48, further comprising comparing the \u201con ground position\u201d with the predetermined borehole depth
52. The method of claim 48, further comprising resuming the drilling phase when the \u201con ground position\u201d exceeds an allowable depth variation.
53. The method of claim 48, wherein said partially retracting comprises retracting the drill string by a retraction distance.
54. The method of claim 53, wherein the retraction distance is a percentage of the predetermined borehole depth.
55. The method of claim 54, wherein the percentage is about 25%.
56. The method of claim 53, wherein the retraction distance is a fixed distance.

The claims below are in addition to those above.
All refrences to claim(s) which appear below refer to the numbering after this setence.

1. A regimen for the treatment of acne vulgaris, comprising topically applying onto the afflicted skin area of an individual in need of such treatment, a thus effective amount of an adapalene formulation at least once every two days for a period of time of at least six months.
2. The acne vulgaris regimen as defined by claim 1, said topical adapalene formulation comprising an aqueous gel composition.
3. The acne vulgaris regimen as defined by claim 1, said topical adapalene formulation comprising at least 0.2% adapalene by weight.
4. The acne vulgaris regimen as defined by claim 1, said topical adapalene formulation comprising at least 0.3% adapalene by weight.
5. The acne vulgaris regimen as defined by claim 1, said topical adapalene formulation comprising from 0.25% to 0.5% adapalene by weight.
6. The acne vulgaris regimen as defined by claim 1, comprising topically applying said adapalene formulation once daily onto said afflicted skin area.
7. The acne vulgaris regimen as defined by claim 6, comprising topically applying said adapalene formulation once daily, in the evening after wash, onto said afflicted skin area.
8. The acne vulgaris regimen as defined by claim 1, comprising topically applying said adapalene formulation onto said afflicted skin area for at least nine months.
9. The acne vulgaris regimen as defined by claim 1, comprising topically applying said adapalene formulation onto said afflicted skin area for at least twelve months.
10. The acne vulgaris regimen as defined by claim 2, comprising topically applying said aqueous adapalene gel composition onto said afflicted skin area for at least nine months.
11. The acne vulgaris regimen as defined by claim 2, comprising topically applying said aqueous adapalene gel composition onto said afflicted skin area for at least twelve months.
12. The acne vulgaris regimen as defined by claim 1, said afflicted skin area containing 20 to 100 non-inflammatory lesions, 20 to 50 inflammatory lesions, and no active nodules or cysts.