1. A method for billing for time spent in an instant message session by a service person for a project for a customer, said method comprising:
responsive to the instant message session during which an instant message is received by a user from a sender,
(i) retrieving, by one or more processors of a computer system, a name of the sender from the instant message which identifies the sender, and in response
(ii) determining, by the one or more processors, that the sender does not exist in a defined project, based on the retrieved sender’s name not being in previously loaded project settings of the user that include an identification of the project, names of people associated with the project, and keywords associated with the project, and in response
(iii) determining, by the one or more processors, that the instant message does not contain any keywords associated with a project, and in response
(iv) determining, by the one or more processors, that the sender identified by the retrieved sender’s name has not been associated with a previous project, and in response
(v) determining, by the one or more processors, that the sender identified by the retrieved sender’s name has a profile that includes a keyword that the user has associated with a first project, and in response
(vi) associating, by the one or more processors, the first project with the instant message sent by the sender identified by the retrieved sender’s name, and in response
(vii) determining, by the one or more processors, a charge to the first project for labor of the service person based on a duration of the instant message session and a billing rate for the service person for providing a service for the first project, wherein the user is the service person.
2. The method of claim 1, said method further comprising:
generating and electronically recording, by the one or more processors, a consolidated bill for the first project which includes the charge for labor of the service person and an additional charge for services other than for the labor of service person.
3. The method of claim 1, wherein said determining that the sender has not been associated with a previous project comprises searching the user’s project association history to identify a list of previous associations of the user to determine that the list of previous associations do not include an association of the user to a project.
4. A computer program product, comprising one or more computer-readable storage devices and program instructions stored on the one or more storage devices, said program instructions which, upon being executed by one or more processors of a computer system, implement a method for billing for time spent in an instant message session by a service person for a project for a customer, said method comprising:
responsive to the instant message session during which an instant message is received by a user from a sender,
(i) retrieving, by the one or more processors, a name of the sender from the instant message which identifies the sender, and in response
(ii) determining, by the one or more processors, that the sender does not exist in a defined project, based on the retrieved sender’s name not being in previously loaded project settings of the user that include an identification of the project, names of people associated with the project, and keywords associated with the project, and in response
(iii) determining, by the one or more processors, that the instant message does not contain any keywords associated with a project, and in response
(iv) determining, by the one or more processors, that the sender identified by the retrieved sender’s name has not been associated with a previous project, and in response
(v) determining, by the one or more processors, that the sender identified by the retrieved sender’s name has a profile that includes a keyword that the user has associated with a first project, and in response
(vi) associating, by the one or more processors, the first project with the instant message sent by the sender identified by the retrieved sender’s name, and in response
(vii) determining, by the one or more processors, a charge to the first project for labor of the service person based on a duration of the instant message session and a billing rate for the service person for providing a service for the first project, wherein the user is the service person.
5. The computer program product of claim 4, said method further comprising:
generating and electronically recording, by the one or more processors, a consolidated bill for the first project which includes the charge for labor of the service person and an additional charge for services other than for the labor of service person.
6. The computer program product of claim 4, wherein said determining that the sender has not been associated with a previous project comprises searching the user’s project association history to identify a list of previous associations of the user to determine that the list of previous associations do not include an association of the user to a project.
7. A computer system comprising one or more processors, one or more computer-readable memories, one or more computer-readable storage devices, and program instructions stored on the one or more storage devices, said program instructions which, upon being executed by the one or more processors via the one or more memories, implement a method for billing for time spent in an instant message session by a service person for a project for a customer, said method comprising:
responsive to the instant message session during which an instant message is received by a user from a sender,
(i) retrieving, by the one or more processors, a name of the sender from the instant message which identifies the sender, and in response
(ii) determining, by the one or more processors, that the sender does not exist in a defined project, based on the retrieved sender’s name not being in previously loaded project settings of the user that include an identification of the project, names of people associated with the project, and keywords associated with the project, and in response
(iii) determining, by the one or more processors, that the instant message does not contain any keywords associated with a project, and in response
(iv) determining, by the one or more processors, that the sender identified by the retrieved sender’s name has not been associated with a previous project, and in response
(v) determining, by the one or more processors, that the sender identified by the retrieved sender’s name has a profile that includes a keyword that the user has associated with a first project, and in response
(vi) associating, by the one or more processors, the first project with the instant message sent by the sender identified by the retrieved sender’s name, and in response
(vii) determining, by the one or more processors, a charge to the first project for labor of the service person based on a duration of the instant message session and a billing rate for the service person for providing a service for the first project, wherein the user is the service person.
8. The computer system of claim 7, said method further comprising:
generating and electronically recording, by the one or more processors, a consolidated bill for the first project which includes the charge for labor of the service person and an additional charge for services other than for the labor of service person.
9. The computer system of claim 7, wherein said determining that the sender has not been associated with a previous project comprises searching the user’s project association history to identify a list of previous associations of the user to determine that the list of previous associations do not include an association of the user to a project.
The claims below are in addition to those above.
All refrences to claim(s) which appear below refer to the numbering after this setence.
1-8. (canceled)
9. A system for trend-based target setting in a process control environment, comprising:
a computer comprising a processor; and
instructions which are executable, using the processor, to implement functions comprising:
selecting a particular entity from among a plurality of entities;
obtaining historical process control data for a group of related entities, the group comprising the selected entity and at least one additional one of the plurality of entities;
determining, from the obtained historical process control data, an observed number of non-conforming instances of each of the entities in the group and a total number of instances of each of the entities;
computing a rate of non-conformance, for each of the entities in the group, by dividing the determined number of non-conforming instances by the determined total number of instances;
computing a representative rate of non-conformance for the group, using the computed rate of non-conformance for each of the entities in the group; and
setting, as a process control target for the selected entity, an expected rate of non-conformance derived from the rate of non-conformance computed for each of the entities in the group and the computed representative rate of non-conformance for the group.
10. The system according to claim 9, wherein:
the related entities comprising the group are hierarchically related; and
the entities comprising the group are products represented at a level of the hierarchy, the products together forming a commodity which is represented at a next-higher level of the hierarchy.
11. The system according to claim 9, wherein the functions further comprise:
iteratively monitoring the process control target, over a period of time, using trend analysis to determine whether the process control target is suitable for the selected entity; and
responsive to detecting that an actual rate of non-conformance for the selected entity, over the period of time, varied from the expected rate of non-conformance set as the process control target for the selected entity by more than a selected confidence interval, automatically setting, as the process control target for the selected entity, a new expected rate of non-conformance derived using the actual rate of non-conformance and a bound of the selected confidence interval.
12. The system according to claim 11, wherein the functions further comprise:
applying at least one policy to the new expected rate of non-conformance to adjust the process control target according to a predetermined non-conformance target guideline.
13. The system according to claim 12, wherein applying the at least one policy comprises:
determining an age of the entity; and
adjusting the process control target in view of historically-observed changes in the rate of non-conformance that results from entity age.
14. The system according to claim 9, wherein the functions further comprise:
iteratively monitoring the process control target, over a period of time, using trend analysis to determine whether the process control target is suitable for the selected;
computing a midpoint of a 2-sided confidence bound for the group, an interval of the 2-sided confidence bound comprising a predetermined value; and
responsive to detecting that an actual rate of non-conformance for the selected entity, over the period of time, falls outside the interval, resetting the expected rate of non-conformance to fall within (1) a first interval between a lower side of the 2-sided confidence bound and the computed midpoint and (2) a second interval between the computed midpoint and an upper side of the 2-sided confidence bound, according to whether the detected actual rate is closer to the first interval or the second interval, respectively.
15. A computer program product for trend-based target setting in a process control environment, the computer program product comprising:
a computer readable storage medium having computer readable program code embodied therein, the computer readable program code configured for:
selecting a particular entity from among a plurality of entities;
obtaining historical process control data for a group of related entities, the group comprising the selected entity and at least one additional one of the plurality of entities;
determining, from the obtained historical process control data, an observed number of non-conforming instances of each of the entities in the group and a total number of instances of each of the entities;
computing a rate of non-conformance, for each of the entities in the group, by dividing the determined number of non-conforming instances by the determined total number of instances;
computing a representative rate of non-conformance for the group, using the computed rate of non-conformance for each of the entities in the group; and
setting, as a process control target for the selected entity, an expected rate of non-conformance derived from the rate of non-conformance computed for each of the entities in the group and the computed representative rate of non-conformance for the group.
16. The computer program product according to claim 15, wherein:
the related entities comprising the group are hierarchically related; and
the entities comprising the group are products represented at a level of the hierarchy, the products together forming a commodity which is represented at a next-higher level of the hierarchy.
17. The computer program product according to claim 15, wherein the computer readable code is further configured for:
iteratively monitoring the process control target, over a period of time, using trend analysis to determine whether the process control target is suitable for the selected entity; and
responsive to detecting that an actual rate of non-conformance for the selected entity, over the period of time, varied from the expected rate of non-conformance set as the process control target for the selected entity by more than a selected confidence interval, automatically setting, as the process control target for the selected entity, a new expected rate of non-conformance derived using the actual rate of non-conformance and a bound of the selected confidence interval.
18. The computer program product according to claim 17, wherein the computer readable code is further configured for:
applying at least one policy to the new expected rate of non-conformance to adjust the process control target according to a predetermined non-conformance target guideline.
19. The computer program product according to claim 18, wherein applying the at least one policy comprises:
determining an age of the entity; and
adjusting the process control target in view of historically-observed changes in the rate of non-conformance that results from entity age.
20. The computer program product according to claim 15, wherein the computer readable code is further configured for:
iteratively monitoring the process control target, over a period of time, using trend analysis to determine whether the process control target is suitable for the selected;
computing a midpoint of a 2-sided confidence bound for the group, an interval of the 2-sided confidence bound comprising a predetermined value; and
responsive to detecting that an actual rate of non-conformance for the selected entity, over the period of time, falls outside the interval, resetting the expected rate of non-conformance to fall within (1) a first interval between a lower side of the 2-sided confidence bound and the computed midpoint and (2) a second interval between the computed midpoint and an upper side of the 2-sided confidence bound, according to whether the detected actual rate is closer to the first interval or the second interval, respectively.