1. An apparatus for maintaining plant equipment comprising:
an input it configured to receive information on targets and ranges of plant equipment to be maintained, that constitute a plant, inspection information and operation-history information;
a failure-event tree breakdown unit configured to perform tree-breakdown on failures to be expected from a failure event to be inspected, in order to obtain a failure-event tree;
a failure-unreliability function calculation unit configured to calculate unreliability of a resultant event in the failure-event tree with respect to a causal event in the failure-event tree preceding the resultant event;
a failure-derived monetary loss calculation unit configured to multiply each unreliability and a cost of recovery from each event and accumulate results of multiplication in accordance with the failure-event tree breakdown, thus obtaining a recovery cost;
a preventive-maintenance expense calculation unit configured to calculate preventive maintenance expenses for preventing failure events; and
a maintenance decision-making unit configured to decide maintenance timing and technique through comparison between the recovery cost and the preventive maintenance expenses.
2. The apparatus for maintaining plant equipment according to claim 1, wherein:
the failure-event tree breakdown unit has a failure-event tree database constructed based on inspection histories and operation histories for the plant to be maintained and other plants; and
the failure-event tree breakdown unit is configured to perform the tree-breakdown from a specific failure-event of a specific part of the plant to be maintained inputted by an input unit, while referring to contents of the database.
3. The apparatus for maintaining plant equipment according to claim 1, wherein:
the failure-unreliability function calculation unit has a failure-unreliability function database constructed based on inspection histories and operation histories for the plant to be maintained and other plants; and
the failure unreliability function calculation unit is configured to calculate the unreliability while referring to the database based on failure-unreliability function between the resultant even and the causal event in the failure-event tree in accordance with information on parts of the plant and events inputted via the input unit.
4. The apparatus for maintaining plant equipment according to claim 1, wherein the failure-event tree breakdown unit and the failure-unreliability function calculation unit adjust the order of the failure events in the failure-event tree and failure-unreliability function.
5. The apparatus for maintaining plant equipment according to claim 1, wherein the unreliability of the plant equipment is given using cumulative hazard function based on an operation time at which each failure event occurs.
6. An apparatus for maintaining plant equipment comprising:
an input it configured to receive information on targets and ranges of plant equipment to be maintained, that constitute a plant, inspection information and operation-history information;
an inspection-priority item selection unit configured to select a failure event as a priority item to be inspected which is stored in a failure event tree database;
an inspection unit configured to inspect the selected failure event;
a failure-event tree breakdown unit configured to perform tree-breakdown on failures to be expected from the failure event to be inspected, in order to obtain a failure-event tree;
a failure-unreliability function calculation unit configured to calculate unreliability of a resultant event in the failure-event tree with respect to a causal event in the failure-event tree preceding the resultant event;
a failure-derived monetary loss calculation unit configured to multiply each unreliability and a cost of recovery from each resultant event and accumulate results of multiplication in accordance with the failure-event tree breakdown, thus obtaining a recovery cost;
a preventive-maintenance expense calculation unit configured to calculate preventive maintenance expenses for preventing failure events; and
a maintenance decision-making unit configured to decide maintenance timing and technique through comparison between the recovery cost and the preventive maintenance expenses.
7. The apparatus for maintaining plant equipment according to claim 6, wherein:
the failure-event tree breakdown unit has a failure-event tree database constructed based on inspection histories and operation histories for the plant to be maintained and other plants; and
the failure-event tree breakdown unit is configured to perform the tree-breakdown from a specific failure-event of a specific part of the plant to be maintained inputted by an input unit, while referring to contents of the database.
8. The apparatus for maintaining plant equipment according to claim 6, wherein:
the failure-unreliability function calculation unit has a failure-unreliability function database constructed based on inspection histories and operation histories for the plant to be maintained and other plants; and
the failure-unreliability function calculation unit is configured to calculate the unreliability while referring to the database based on failure-unreliability function between the resultant event and the causal event in the failure-event tree in accordance with information on part of the plant and events inputted via the input unit.
9. The apparatus for maintaining plant equipment according to claim 6, wherein the failure-event tree breakdown unit and the failure-unreliability function calculation unit adjust the order of the failure events in the failure-event tree and failure-unreliability function.
10. The apparatus for maintaining plant equipment according to claim 6, wherein the unreliability of the plant equipment is given using cumulative hazard function based on an operation time at which each failure event occurs.
11. The apparatus for maintaining plant equipment according to claim 6, wherein the inspection unit comprises a CCD camera capable of accessing to a part to be inspected without disassembling a plant equipment in order to take a still image or a moving image, and a image analysis device configured to analyze a image data sent from the CCD camera.
12. The apparatus for maintaining plant equipment according to claim 6, the inspection unit comprises an ultrasonic inspection device capable of detect a crack formed in a plant equipment from an outer surface thereof without disassembling the plant equipment.
13. An apparatus for maintaining plant equipment comprising:
an input unit configured to receive information on targets and ranges of plant equipment to be maintained, that constitute a plant, inspection information and operation-history information;
a monitoring-item selection unit configured to select a failure event as a priority item to be monitored which is stored in a failure event tree database;
an on-line monitoring unit configured to monitor the selected failure event;
a failure-event tree breakdown unit configured to perform tree-breakdown on failures to be expected from the failure event to be inspected, in order to obtain a failure-event tree;
a failure-unreliability function calculation unit configured to calculate unreliability of a resultant event in the failure-event tree with respect to a causal event in the failure-event tree preceding the resultant event;
a failure-derived monetary loss calculation unit configured to multiply each unreliability and a cost of recovery from each event and accumulate results of multiplication in accordance with the failure-event tree breakdown, thus obtaining a recovery cost;
a preventive-maintenance expense calculation unit configured to calculate preventive maintenance expenses for preventing failure events; and
a maintenance decision-making unit configured to decide maintenance timing and technique through comparison between the recovery cost and the preventive maintenance expenses.
14. The apparatus for maintaining plant equipment according to claim 13, wherein:
the failure-event tree breakdown unit has a failure-event tree database constructed based on inspection histories and operation histories for the plant to be maintained and other plants; and
the failure-event tree breakdown unit is configured to perform the tree-breakdown from a specific failure-event of a specific part of the plant to be maintained inputted by an input unit, while referring to contents of the database.
15. The apparatus for maintaining plant equipment according to claim 13, wherein:
the failure-reliability function calculation unit has a failure-unreliability function database constructed based on inspection histories and operation histories for the plant to be maintained and other plants; and
the failure-reliability function calculation unit is configured to calculate the unreliability while referring to the database based on failure-unreliability function between the resultant event and the causal event in the failure-event tree in accordance with information on parts of the plant and events inputted via the input unit.
16. The apparatus for maintaining plant equipment according to claim 13, wherein the failure-event tree breakdown unit and the failure-unreliability function calculation unit adjust the order of the failure events in the failure-event tree and failure-unreliability function.
17. The apparatus for maintaining plant equipment according to claim 13, wherein the unreliability of the plant equipment is given using cumulative hazard function based on an operation time at which each failure event occurs.
18. The apparatus for maintaining plant equipment according to claim 13, wherein the on-line monitoring unit is capable of remote abnormal-signal monitoring to at least one of factor that are in-plant fluid pressure, temperature, rotation speed, load, vacuum, in-fluid impurity density, cooling speed and time, deformation, displacement, decrease in wall thickness, fluid-level height and vibration.
19. The apparatus for maintaining plant equipment according to claim 13, wherein the on-line monitoring unit utilizes electric signals, ultrasonic sound or acoustic emission, or their combination.
20. A method of maintaining plant equipment comprising the steps of:
receiving information on targets and ranges of plant equipment to be maintained, that constitute a plant, inspection information and operation-history information;
performing tree-breakdown on failures to be expected from a failure-event to be inspected, thereby obtaining a failure-event tree;
calculating unreliability of every resultant event in the failure-event tree with respect to corresponding causal event in the failure event tree;
multiplying each unreliability and a cost of recovery from each event to and accumulating results of multiplication in accordance with the failure-event tree breakdown, thereby obtaining a recovery cost;
calculating preventive maintenance expenses for preventing failure events; and
deciding maintenance timing and technique through comparison between the recovery cost and the preventive maintenance expenses.
21. A method of maintaining plant equipment comprising the steps of:
receiving information on plant equipment to be maintained, that constitute a plant, inspection information and operation-history information;
selecting failure event as a priority item to be inspected which is stored in a failure event tree database;
inspecting the selected failure event;
performing tree-breakdown on failures to be expected from the failure event to be inspected, thereby obtaining a failure-event tree;
calculating unreliability of every resultant event in the failure-event tree with respect to corresponding causal event in the failure event tree;
multiplying each unreliability and a cost of recovery from each resultant event and accumulating results of multiplication in accordance with the failure-event tree breakdown, thereby obtaining a recovery cost;
calculating preventive maintenance expenses for preventing failure events; and
deciding maintenance timing and technique through comparison between the recovery cost and the preventive maintenance expenses.
22. A method of maintaining plant equipment comprising the steps of:
receiving information on targets and ranges of plant equipment to be maintained, that constitute a plant, inspection information and operation-history information;
selecting a failure event as a priority item to be inspected which is stored in a failure event tree database;
monitoring the selected failure event;
performing tree-breakdown on failures to be expected from the failure event to be inspected;
calculating unreliability of each item in the failure-event tree breakdown;
multiplying each unreliability and a cost of recovery from each resultant event and accumulating results of multiplication in accordance with the failure-event tree breakdown, thus obtaining a recovery cost;
calculating preventive maintenance expenses for preventing failure events; and
deciding maintenance timing and technique through comparison between the recovery cost and the preventive maintenance expenses.
23. A method of maintaining plant equipment comprising the steps of:
transmitting, over a network, data from inspection and monitoring units for equipment that constitute each of a plurality of plants, each plant having a plurality of units;
processing the transmitted data through failure-event tree breakdown, failure-unreliability function calculation, failure-derived monetary loss calculation, failure-derived monetary loss calculation and preventive-maintenance expense calculation;
storing the processed data in a failure-event tree database and a failure-unreliability function database or learning, for providing the accuracy of failure-unreliability function calculation in maintenance decision making; and
transmitting results of maintenance decision making to the plants.
The claims below are in addition to those above.
All refrences to claim(s) which appear below refer to the numbering after this setence.
1. A bicycle carrier, comprising:
first and second pairs of towers securing a pair of parallel crossbars on top of a vehicle,
a fork block device,
a wheel tray portion connected to the fork block device, the fork block device being configured to clamp around one of the crossbars, and
a skewer assembly configured to secure forks of a bicycle to the fork block device, where the skewer assembly includes a skewer bolt passing through the fork block, an adjustment member permitting alteration of the skewer assembly to clamp various fork configurations, a cam lever moveable between open and closed positions, the adjustment member being hidden when the cam lever is in the closed position, and a lock for selectively retaining the lever in the closed position, wherein the adjustment member, cam lever, and lock are all located on the same side of the fork block so all manipulation to adjust, secure, and lock the front forks of a bicycle to the fork block may be performed from one side of the fork block.
2. The bicycle carrier of claim 1, wherein the skewer assembly includes a housing, the operation of the lever shifts the adjustment member into and at least partially out of the housing.
3. The bicycle carrier of claim 2, wherein the adjustment member is wheel-shaped and threads onto the skewer bolt.
4. The bicycle carrier of claim 1, wherein the fork block is selectively removable from the crossbar.
5. The bicycle carrier of claim 4, wherein the fork block includes a locking mechanism adjustable between first and second configurations, where in the first configuration the locking mechanism prevents the fork block from being removed from the rack structure and in the second configuration the locking mechanism allows the fork block to be removed from the crossbar.
6. The bicycle carrier of claim 5, wherein the locking mechanism is configured so that it can only be transitioned between the first and second configurations when the skewer assembly is removed from the bicycle securing portion.
7. The bicycle carrier of claim 1, where the fork block includes an elongate extension portion extending between the skewer assembly and a wheel tray mount configured to receive an end of the wheel tray.
8. The bicycle carrier of claim 1, where the fork block includes a moveable jaw pivotally connected to a fixed jaw at a hinge point, the jaws defining an opening therebetween adapted to receive a crossbar, where the opening is shaped to receive and clamp on either a round or a rectangular crossbar.
9. The bicycle carrier of claim 8, wherein the opening is shaped to hold a round crossbar in a position with the center of the crossbar closer to the hinge point than where the opening holds a rectangular crossbar.