1. A method for manufacturing a metallic stamp for manufacturing a polymer optical device, the method comprising:
a) engraving a unit device planar lightwave circuit (PLC) mold pattern on a first silicon substrate through electron beam lithography and an etching process;
b) embossing a unit PLC device pattern on a first poly methyl methacrylate (PMMA) sheet using the PLC mold pattern by a thermal imprint process;
c) performing an annealing to the unit PLC device pattern imprinted on the first PMMA sheet;
d) forming a first groove pattern, which is an embossed pattern, for supporting an optical fiber, using a second poly methyl methacrylate (PMMA) sheet;
e) aligning the first groove pattern and the unit device pattern;
f) making an integrated polydimethylsiloxane (PDMS) mold for a unit device using the aligned unit PLC device pattern and first groove pattern, the integrated PDMS mold having an engraved pattern which corresponds to the aligned unit PLC device pattern and first groove pattern; and
g) producing a plurality of integrated PDMS molds by repeating the steps of a) through g);
h) forming a PDMS pattern using the plurality of integrated PDMS molds, the PDMS pattern having a pattern corresponding to the plurality of integrated PDMS molds; and
i) making the metallic stamp through electroforming using the PDMS pattern,
wherein the step of forming the PDMS pattern comprises:
preparing the plurality of integrated PDMS molds as large as a size of the metallic stamp and then cutting the plurality of integrated PDMS molds using a guide pattern;
placing the plurality of integrated PDMS molds having different heights on a glass plate or substrate having the same size as the metallic stamp;
pouring liquid PDMS on the plurality of integrated PDMS molds placed on the glass plate or substrate; and
thermal curing the poured PDMS under the same curing condition as a curing condition of the integrated PDMS mold for the unit device.
2. The method according to claim 1, wherein the metallic stamp is implemented in a state in which the unit PLC device pattern and the first groove pattern for supporting the optical fiber are integrated.
3. The method according to claim 1, wherein the step of embossing the unit PLC device pattern comprises:
transferring an embossing pattern on the first PMMA sheet through the thermal imprint process based on guide pins included in the first silicon substrate having the unit device PLC mold pattern formed therein.
4. The method according to claim 3, wherein the guide pins formed in the first silicon substrate are positioned at ends of input and output of a unit PLC device, and
wherein the first silicon substrate includes a first guide key pattern for basic alignment of the metallic stamp of a post-process, a second key pattern for precise dicing of unit devices manufactured through the metallic stamp, and third guide key patterns for alignment of the unit PLC device pattern and the first groove pattern.
5. The method according to claim 3, wherein the thermal imprint process includes:
after heating the first PMMA sheet at a temperature greater than a glass transition temperature (Tg), applying a holing pressure greater than an initial pressure to the first PMMA sheet after the initial pressure, and applying the initial pressure again applied to the first PMMA sheet.
6. The method according to claim 1, wherein the step of the performing the annealing to the unit PLC device pattern is performed at a glass transition temperature or less (sub-Tg).
7. The method according to claim 1, wherein the step of forming the first groove pattern comprises:
coating a second silicon substrate with imprint resin to have a thickness smaller than a height of the first groove pattern to form a resist;
imprinting a quadrangular pattern on the resist at a time using a stamp for the unit device, the quadrangular pattern having the same line width as the unit PLC device pattern and the first groove pattern;
forming on the second silicon substrate a V-shaped groove pattern through anisotropic wet etching using the resist or a quadrangular groove pattern through a reactive ion etching (RIE) technique using the resist;
forming an embossing pattern corresponding to the V-shaped groove pattern or the quadrangular groove pattern through UV imprint using the second silicon substrate, a UV resist, and the second PMMA sheet; and
leaving only the first groove pattern in the formed embossing pattern using a key pattern for dicing.
8. The method according to claim 7, wherein the first groove pattern is disposed on the same line as the inputoutput of a unit PLC device.
9. The method according to claim 1, wherein the step of making the integrated PDMS mold for the unit device comprises:
performing 45 degree polishing to the unit PLC device pattern and the first groove pattern; and
integrally aligning the unit PLC device pattern and the first groove pattern, and making an engraving PDMS mold having the unit PLC device pattern and the first groove pattern integrated through a replica molding process.
10. The method according to claim 9, wherein in the replica molding process, bubbles are removed under a vacuum atmosphere, and the engraving PDMS pattern having the unit PLC pattern engraved therein is formed by removing even entrapped voids using ultrasonic vibration energy and then curing the engraving PDMS pattern at a temperature of 60\xb0 C. for approximately 3 hours.
11. The method according to claim 1, wherein the step of manufacturing the metallic stamp comprises:
depositing a base layer on the PDMS pattern; and
forming a nickel mold through nickel electrolysis plating, and
wherein a deposition temperature and a deposition rate of the base layer are controlled to prevent cracks and exfoliation from a substrate due to thermal expansion caused by a difference in surface temperature between metals deposited in the deposition of the base layer.
12. The method according to claim 11, wherein in the control of the deposition temperature and the deposition rate, the base layer is deposited at a temperature of 90\xb110\xb0 C. at a deposition rate of 0.8\xb10.2 \u212bsec.
The claims below are in addition to those above.
All refrences to claim(s) which appear below refer to the numbering after this setence.
1. A communications network comprising a plurality of nodes configured to:
analyze an aggregated link between a first end point and a second end point, wherein the aggregated link comprises a plurality of sub-links extending from the first end point to the second end point;
identify a partial fault of the aggregated link, wherein the partial fault comprises a failure of one, but not all, of the sub-links in the aggregated link;
determine whether the partial fault impacts a capacity of a first path comprising the aggregated link; and
if the partial fault impacts the capacity of the first path, propagate the partial fault,
wherein if the partial fault does not impact the capacity of the first path, the partial fault is not propagated.
2. The network of claim 1, wherein the nodes are further configured to:
generate a fault report for the first path; and
consolidate the first fault report with other fault reports received from downstream nodes in the first path thereby creating a consolidated fault report, wherein consolidating the first fault report with other fault reports comprises determining the capacity of the first path based on the first fault report and the other fault reports, and
wherein propagating the partial fault comprises: transmitting, by the node, the consolidated fault report to upstream nodes in the first path.
3. The network of claim 1, wherein the nodes are further configured to:
generate a first fault report for the first path;
combine the first fault report with a second fault report for a second path affected by the partial fault thereby creating a consolidated fault report,
transmit the consolidated fault report to a node traversed by both of the first path and the second path;
separate the combined fault report into the first fault report and the second fault report;
transmit the first fault report to a first plurality of source nodes associated with the first path, and
transmit the second fault report to a second plurality of source nodes associated with the second path.
4. The network of claim 1, wherein the plurality of nodes are further configured to:
reconfigure data transported between the first end point and the second end point by transferring at least some of the data from the first path to a second path.
5. The network of claim 4, wherein reconfiguring data transported between the first end point and second end point further comprises transferring at least some of the data from the first path to a third path, and
wherein a policy table prioritizes the second path and the third path such that the second path receives a greater share of the capacity than the third path when performing a reconfiguration process.
6. The network of claim 4, wherein the second path comprises a working path, a protection path, or both, and
wherein a policy for reconfiguring data transported between the first end point and the second end point comprises at least one of:
a partial or full rerouting of the data from the first path to the working path, the protection path, or both; and
a proportional rerouting of the data from the first path to the protection path until the protection path is at full capacity.
7. A method for communicating information within a network, the method comprising:
analyzing a path between a first end point and a second end point by a node on the path between the first end point and the second point, wherein the path comprises a plurality of sub-links extending between the first end point and the second end point;
identifying a partial fault along the path by the node;
generating a first fault report by the node; and
transmitting the first fault report to one or more other nodes that are affected by the partial fault, wherein the first fault report is not transmitted to any nodes not affected by the partial fault.
8. The method of claim 7 further comprising: consolidating, by the node, the first fault report with at least one other fault report received from a downstream node positioned downstream from the node;
wherein the one or more other nodes are positioned upstream from the node.
9. The method of claim 7, further comprising:
analyzing how the first fault report and the at least one other fault report affects the one or more other nodes, and
modifying the consolidated fault report accordingly prior to transmitting the consolidated fault report to the one or more other nodes.
10. The method of claim 9, wherein the first end point is configured to reconfigure data transported between the first end point and the second end point by transferring less than all of the data on the path.
11. The method of claim 7, wherein consolidating the fault report with the other fault reports received from the at least one downstream node comprises determining a capacity of the path based on the first fault report and the at least one other fault report received from the downstream node.
12. A method comprising:
monitoring a composite link between a first processor and a second processor, wherein the composite link comprises a plurality of component links;
distributing a plurality of Ethernet communications over the component links based on a distribution algorithm;
identifying a failure in at least one, but not all, of the component links;
determining whether the failure affects any of the communications; and
responsive to a determination that the failure affects some of the communications, generating a status report associated with the affected communications and transmitting the status report to a node associated with the affected communications.
13. The method of claim 12, further comprising:
redistributing at least some of the communications from the failed component link(s) to the non-failed component link(s); and
determining that the redistributed communications are not affected by the failed component link(s).
14. A network comprising:
a composite link comprising a plurality of component links that can fail independently, which causes composite link capacity reduction but not loss,
wherein whether a composite link function must send status information indicating the reduced capacity or failure of link connections depends on a recovery mechanism in use such that: if the composite link function can fully recover the lost connectivity locally by redistributing traffic across the working, non-failed component links, the composite link function does not send status information; and if local action is not sufficient to recover lost connectivity, status information is sent on selected connections depending on a recovery policy.
15. The network of claim 14, wherein the recovery policy is that some link connections are selectively shutdown to avoid others being affected or that several link connections signal their reduced capacity to their connection endpoints to allow connectivity for all links according to a fair reduction.
16. A method for communicating information within a network, the method comprising:
receiving, by a network node, a fault report from a downstream or upstream node; wherein the fault report is of a working path traversing the network node and the downstream or upstream node;
determining whether the fault report affects the path; and
responsive to the determination that the fault report affects the path, transmitting the fault report only to an upstream or only to a downstream node in the path.
17. The method of claim 16 further comprising:
consolidating the fault report with fault reports from a plurality of other nodes, thereby producing a consolidated fault report; and
using the consolidated fault report to determine whether any upstream or downstream nodes are affected.
18. The method of claim 17 further comprising:
determining whether the fault report affects the capacity of a reserved connection;
responsive to the determination that the fault report does not affect the capacity of the reserved connection, not transmitting the fault report to any upstream nodes associated with the reserved connection.
19. The method of claim 16, wherein the fault report identifies a partial fault of the path which comprises an aggregated link comprising multiple sub-links; wherein the partial failure comprises the failure of one but not all of the sub-links in the aggregated link.
20. The method of claim 16, wherein the fault report is reported to the upstream nodes or downstream nodes based on pre-established paths.
21. The method of claim 16, wherein the fault report indicates a fault has been cleared, and wherein the fault report indicates an increase in the capacity of the path.
22. A communications system comprising:
a first path end point and a second path end point;
a network in communication with the first path end point and the second path end point, the network comprising:
a plurality of working paths that transport data between the first path end point and the second path end point;
a protection path configured to transport data between the first path end point and the second path end point;
wherein the network determines whether any of the working paths are affected by a fault, and responsive to the determination that one of the working paths is affected by the fault, the network transfers at least some of the data from the affected working path to the protection path.
23. The system of claim 22, wherein the network transfers less than all of the data from the affected working path to the protection path.
24. The system of claim 22, wherein the network determines whether one of the working paths is affected by the fault by analyzing the packet drop rate for the working path.
25. The system of claim 22, wherein the fault is a partial fault.
26. The system of claim 22, wherein the network maintains the order of any order-specific data transported through the network when the network transfers at least some of the data from the affected working path to the protection path.
27. The system of claim 22, wherein the capacity of the protection path is not equal to the sum of the capacities of the working paths.
28. The system of claim 22, wherein the protection path transports data between the first path end point and the second path end point.
29. The system of claim 22, wherein the network transfers at least some of the data back to the working path when a fault clear message is received.