1. Process for the metathesis reaction of unsaturated organic compounds comprising at least one unsaturated organic compound in liquid or dissolved form is mixed with at least one metathesis catalyst in liquid or dissolved form in at least one microreactor and reacted for a residence time, to form an organic compound which is optionally isolated from the reaction mixture, wherein the microreactor is a static micromixer, and wherein the total volume of reactants is less than 1000 \u03bcl, and the liquids in the reactor are vertically separated and subsequently rejoined in such a way so that a vertical boundary layer develops.
2. Process according to claim 1, wherein the microreactor is connected via an outlet to a capillary.
3. Process according to claim 1, wherein the volume of the microreactor is \u2266100 \u03bcl.
4. Process according to claim 1, wherein the microreactor is heatable.
5. Process according to claim 1, wherein the microreactor has channels having a diameter of from 10 to 1000 \u03bcm.
6. Process according to claim 1, wherein the reaction mixture flows through the microreactor at a flow rate of from 0.01 \u03bclmin to 100 mlmin.
7. Process according to claim 1, wherein the residence time of the compounds employed in the microreactor, and the capillaries, is \u226615.
8. Process according to claim 1, wherein it is carried out at a temperature of from \u2212100 to +250\xb0 C.
9. Process according to claim 1, wherein the course of the reaction is monitored by chromatography and optionally regulated.
10. Process according to claim 1, wherein the unsaturated organic compounds are selected from aliphatic, aromatic or heteroaromatic alkenes.
11. Process according to claim 1, wherein at least one metathesis catalyst which is a carbene or carbine complex or a mixture thereof is used.
12. Process according to claim 11, wherein the carbine complex used is at least one bis(tricyclohexylphosphine)-benzylideneruthenium dichioride Grubbs catalyst 2,6-diisopropylphenylimido-neophylidenemolybdenum bis(hexafluoro-tert-butoxide or Schrock catalyst or a mixture thereof.
13. Process according to claim 1, wherein the unsaturated organic compound is employed in an equimolar ratio or a molar excess of up to 10,000-fold, relative to the metathesis catalyst.
14. Process according to claim 1, wherein the metathesis reaction is a ring-closing metathesis reaction of an unsaturated organic compound.
The claims below are in addition to those above.
All refrences to claim(s) which appear below refer to the numbering after this setence.
1. An horological device comprising:
a floating gate field effect transistor (FGFET), wherein the FGFET has a substantially discharged state before a programming operation and has a controlled discharge state after the programming operation, and wherein the FGFET transitions after the programming operation from the controlled discharge state to the substantially discharged state within a predetermined time period after the programming operation; and
a conductive lead connected to the FGFET to allow reading a state of the FGFET, wherein a voltage at a source of the FGFET or at a drain of the FGFET during a read operation indicates whether or not the predetermined time period has elapsed after the programming operation.
2. A method for measuring time comprising:
discharging a floating gate in a floating gate field effect transistor (FGFET), wherein the FGFET comprises the floating gate and an insulating region of insulating material adjacent to the floating gate, wherein a discharge process discharges electrostatic charge that is stored within the floating gate through the insulating region, and wherein the thickness of the insulating region has been manufactured to cause a threshold voltage of the FGFET to reach a predetermined threshold voltage within a predetermined time period after storing the electrostatic charge within the floating gate; and
performing a read operation on the FGFET to determine whether or not the predetermined time period has elapsed after storing the electrostatic charge within the floating gate, wherein a voltage at a source of the FGFET or at a drain of the FGFET during a read operation indicates whether or not the predetermined time period has elapsed.
3. A computer program product on a computer readable medium for use in a data processing system for measuring time with an horological device, the computer program product comprising:
instructions for receiving a time measurement request for the horological device, wherein the horological device includes a floating gate in a floating gate field effect transistor (FGFET), wherein the FGFET comprises the floating gate and an insulating region of insulating material adjacent to the floating gate, wherein a discharge process discharges electrostatic charge that is stored within the floating gate through the insulating region, and wherein the thickness of the insulating region has been manufactured to cause a threshold voltage of the FGFET to reach a predetermined threshold voltage within a predetermined time period after storing the electrostatic charge within the floating gate; and
instructions for performing a read operation on the FGFET to determine whether or not the predetermined time period has elapsed after storing the electrostatic charge within the floating gate, wherein a voltage at a source of the FGFET or at a drain of the FGFET during a read operation indicates whether or not the predetermined time period has elapsed.
4. An horological device comprising:
an internal medium for storing an electrostatic charge;
an insulating medium for insulating the internal medium, the internal medium and the insulating medium forming a charge storage element,
wherein the insulating medium substantially surrounds the internal medium;
wherein the insulating medium has physical properties that allow a charging process for charging the internal medium with an electrostatic charge through the insulating medium;
wherein the insulating medium has physical properties that allow a discharge process for discharging a stored electrostatic charge from the internal medium through the insulating medium;
wherein the insulating medium has one or more physical properties that affect a rate of discharge in the discharge process; and
wherein at least one physical property of the insulating medium has been selected so that the discharge process discharges a portion of the stored electrostatic charge within a predetermined time period; and
a conductive lead electrically coupled to the insulating medium wherein a voltage on the conductive lead during a read operation indicates whether or not the predetermined time period has elapsed after the charging process.
5. An horological device comprising:
a first floating gate field effect transistor (FGFET), wherein the first FGFET comprises a first source, a first drain, and a floating gate with an insulating region of insulating material adjacent to the floating gate;
a second FGFET, wherein the second FGFET comprises a second source, a second drain, and the floating gate such that the second FGFET shares the floating gate with the first FGFET, wherein a first portion of the floating gate is proximally located near the first source and the first drain and a second portion of the floating gate is proximally located near the second source and the second drain, wherein a discharge process discharges electrostatic charge that is stored within the floating gate through the insulating region, and wherein the thickness of the insulating region has been manufactured to cause a threshold voltage of the second FGFET to reach a predetermined threshold voltage within a predetermined time period after storing the electrostatic charge within the floating gate; and
conductive leads connected to the second FGFET to allow reading a state of the second FGFET.
6. The horological device of claim 5 wherein a voltage on a conductive lead at a source of the second FGFET or at a drain of the second FGFET during a read operation indicates whether or not the predetermined time period has elapsed after storing the electrostatic charge within the floating gate.
7. The horological device of claim 5 wherein a voltage on a conductive lead at a source of the second FGFET or at a drain of the second FGFET during a read operation is related to the threshold voltage of the second FGFET during the read operation.
8. The horological device of claim 5 further comprising:
means for comparing a voltage on a conductive lead at a source of the second FGFET or at a drain of the second FGFET during a read operation to a reference voltage in order to indirectly determine an elapsed time period after storing the electrostatic charge within the floating gate.
9. The horological device of claim 5 wherein the first FGFET comprises a first control gate and the second FGFET comprises a second control gate.
10. The horological device of claim 9 further comprising:
a coupling gate, wherein the coupling gate is employed to assist in storage of the electrostatic charge within the floating gate.
11. The horological device of claim 5 further comprising:
a coupling gate, wherein the coupling gate is employed to assist in storage of the electrostatic charge within the floating gate.
12. The horological device of claim 5 further comprising:
conductive leads connected to the first FGFET to assist in controlling storage of the electrostatic charge within the floating gate.
13. A method for measuring time comprising:
discharging a floating gate through an insulating region of insulating material adjacent to the floating gate, wherein the floating gate is shared between a first floating gate field effect transistor (FGFET) and a second FGFET, wherein the first FGFET comprises a first source and a first drain, wherein the second FGFET comprises a second source and a second drain, wherein a first portion of the floating gate is proximally located near the first source and the first drain and a second portion of the floating gate is proximally located near the second source and the second drain, wherein a discharge process discharges electrostatic charge that is stored within the floating gate through the insulating region, and wherein the thickness of the insulating region has been manufactured to cause a threshold voltage of the second FGFET to reach a predetermined threshold voltage within a predetermined time period after storing the electrostatic charge within the floating gate;
performing a read operation on the second FGFET to determine whether or not the predetermined time period has elapsed after storing the electrostatic charge within the floating gate.
14. The method of claim 13 comprising:
comparing a voltage on a conductive lead at a source of the second FGFET or at a drain of the second FGFET during a read operation to a reference voltage in order to indirectly determine an elapsed time period after storing the electrostatic charge within the floating gate.
15. The method of claim 13 comprising:
performing a write operation on the first FGFET to store the electrostatic charge within the floating gate.
16. The method of claim 13 comprising:
employing a coupling gate to assist in storage of the electrostatic charge within the floating gate.
17. A computer program product on a computer readable medium for use in a data processing system for measuring time with an horological device, the computer program product comprising:
instructions for receiving a time measurement request for the horological device, wherein the horological device includes a floating gate that discharges electrostatic charge that is stored within the floating gate through an insulating region of insulating material adjacent to the floating gate, wherein the floating gate is shared between a first floating gate field effect transistor (FGFET) and a second FGFET, wherein the first FGFET comprises a first source and a first drain, wherein the second FGFET comprises a second source and a second drain, wherein a first portion of the floating gate is proximally located near the first source and the first drain and a second portion of the floating gate is proximally located near the second source and the second drain, and wherein the thickness of the insulating region has been manufactured to cause a threshold voltage of the second FGFET to reach a predetermined threshold voltage within a predetermined time period after storing the electrostatic charge within the floating gate;
instructions for performing a read operation on the second FGFET to determine whether or not the predetermined time period has elapsed after storing the electrostatic charge within the floating gate.
18. The computer program product of claim 17 comprising:
instructions for comparing a voltage on a conductive lead at a source of the second FGFET or at a drain of the second FGFET during a read operation to a reference voltage in order to indirectly determine an elapsed time period after storing the electrostatic charge within the floating gate.
19. The computer program product of claim 17 comprising:
instructions for performing a write operation on the first FGFET to store the electrostatic charge within the floating gate.
20. The computer program product of claim 17 comprising:
instructions for employing a coupling gate to assist in storage of the electrostatic charge within the floating gate.